
Premier Energy Distribution published an interactive map of available capacity on the medium- and low-voltage electric grid for renewable energy integration.
In particular, in order to inform potential applicants for connection permits to the existing power grid about new generation capacity in advance, Premier Energy Distribution has provided a map with an electrical layout of the 6-35 kV distribution networks. The application shows in different colors the availability of distribution grids for connecting new generation sources. Thus, the green color on it indicates the grids to which there is a possibility of connection. Blue color indicates that connection is unavailable due to overloading of Premier Energy Distribution network elements. The red color indicates distribution networks that are currently without capacity due to congestion in various Moldelectrica network elements. Using filters, it is possible to view separately the congested networks and the networks with available connections. In addition, it is possible to apply different backgrounds for better geo-referenced identification. The Ministry of Energy of Moldova expressed gratitude to Premier Energy Distribution for its responsiveness and transparency. // 10.08.2023 - InfoMarket.