This was reported by the National Energy Regulatory Agency, which noted that all natural gas suppliers operating in the retail market and required to maintain fuel reserves, as well as the company "Moldovagaz," which is responsible for supplying gas to the Transnistrian region, have fully secured the required gas volumes for the 2026–2027 cold season. In accordance with the Law on Natural Gas, suppliers operating in the retail market are required to maintain natural gas reserves. This measure is intended to ensure the security of supply and the stable functioning of the market, including under conditions that could lead to a sharp rise in prices. The minimum volume of reserves must be at least 15% of the average annual natural gas consumption by end users over the past 5 calendar years. For the 2026–2027 heating season, ANRE has required natural gas suppliers operating in the retail market to build up fuel reserves totaling 140,354,900 cubic meters (1,481,873.7 MWh). Ten suppliers operating in both the regulated and free markets have fulfilled this obligation. Separately, ANRE established the volume of natural gas required to ensure gas supplies to the Transnistrian region. According to ANRE Resolution No. 286/2026, as amended by Resolution No. 531/2026, a reserve of 135,972,000 cubic meters of gas (1,435,603 MWh) was to be created for these purposes. Natural gas reserves are stored both directly by suppliers and by operators authorized by them in gas storage facilities located in countries that are parties to the Treaty Establishing the Energy Community, as well as in European Union member states. According to data provided by suppliers and the responsible organizations, both stockpiling obligations have been fulfilled 100%. Ensuring the full supply of the necessary volumes of natural gas is an important measure for strengthening supply security and preparing the energy sector for the 2026–2027 cold season. // 17.11.2026 — InfoMarket
Moldova has fully fulfilled its obligations to build up gas reserves for the winter of 2026–2027
Commitments to build up gas reserves in Moldova for the 2026–2027 heating season, including for the Transnistria region, have been fully met—ANRE